1 NOV 62
TO 'DIRECTOR
OSA
TOR* 1 NOV 62
io PRITY
NITE ACTION,
2
r nlUKI 11 1
N AIRCRAFTADE ONRANSITION RIDE FOR EAST HAM. FLIGHT TOOK-OFF0
FOR
INUTES. GROSS0 LBS WITH CG5 PERCENT. AB
TAKE-OFF AND CLIMB OUTEAS. 0 FEET PILOT CUT OFF
ABOMENT TO ADAPT HIMSELF TO STEEP CLIMB ANGLE. BACX ON
ANDEAS0 FEET. TRIMMED FOR LEVEL FLIGHT -
CHECKED PITCH, ROLL AND YAW DAMPERS. SLOWEDTS0
FEET AND CHECKED SLOW FLYING HANDLING. MILITARY POWEREAS,
AB ONEAS CLIMBED. REACHED0 FEET AND HELD
0 FEET. AB OFF AND CHECKEDUTO PILOT CHECKED
- AB ON AND ACCELERATED TO0 FEET. AB OFF
ORMALHUTE DEPLOYED NORMALLY BUT SPLIT OPEN.
NO PROBLEM SLOWING AIRCRAFT ON RUNWAY. PILOT VERY FAVORABLY IMPRESSED
REGARDING STABILITY AND ACCELERATION. SAYS MUCH BETTERO FLIGHTS TOMORROW. NUMBER THREE DOWN FOR INS INSTALLATION SCHEDULED FRIDAY SOMETIME.
END OF MESSAGE
ttcnii
PRODUCTION BY OTHER THAN THEIG OFFICE IS PROHIBITED. Ccpy No.
Original document.
Comment about this article, ask questions, or add new information about this topic: